Food-grade processing system, 3 °C edible thermal storage, automatic process control, blast freezer cold rooms and oil-free compressed air.
Food production engineering is building services with a hygiene classification attached. The Klang facility combined a food-grade processing system, a 3 °C edible thermal storage system, blast freezer cold rooms and oil-free compressed air — each with material, finish and cleanability requirements that ordinary building services never meet.
The automatic process control system ties it together: temperatures, pressures and sequences held within the bands the product demands, with the instrumentation part of the process rather than an afterthought. On a production facility, commissioning is proven against throughput, not just against equipment function.
Technical particulars
- Process
- Food-grade processing system
- Thermal storage
- 3 °C edible thermal storage
- Refrigeration
- Blast freezer cold rooms
- Utilities
- Oil-free compressed air
- Control
- Automatic process control system
What this kind of commission involves
Process plant work differs from building services in one decisive way: the mechanical and electrical systems are the product line, not a service to it. Downtime is measured in lost output, hygiene or safety classification governs material selection, and the instrumentation is part of the process rather than a monitoring afterthought.
Disciplines engaged
- Process utilities — chilled and process water, steam, compressed air, gases
- Industrial refrigeration, cold rooms, blast freezing and thermal storage
- Food-grade and hygienic services design; material and finish selection
- Oil-free compressed air generation, drying and distribution
- Automatic process control, instrumentation and control narrative
- Electrical distribution, motor control centres and variable speed drives
- Hazardous area classification and equipment selection where applicable
- Process ventilation, extraction and pressure regime control
- Manufacturing equipment installation interfaces and hook-up
- Commissioning against production rate, not just equipment function
What we watch for
The failures that recur on this building type, and where we look for them.
- Utility capacity sized for day one rather than the intended production ramp
- Control narrative written after the panels are built
- Hygiene or classification requirements discovered during installation
- No spare capacity or isolation for maintenance without stopping the line