Skip to content
Process, Oil & Gas, Semiconductor

PROTON City Shower Testing Production Line

Tanjung Malim, Perak

PROTON City Shower Testing Production Line

Scope of works

Process plant M&E for the vehicle water-ingress shower testing line.

What this kind of commission involves

Process plant work differs from building services in one decisive way: the mechanical and electrical systems are the product line, not a service to it. Downtime is measured in lost output, hygiene or safety classification governs material selection, and the instrumentation is part of the process rather than a monitoring afterthought.

Disciplines engaged

  • Process utilities — chilled and process water, steam, compressed air, gases
  • Industrial refrigeration, cold rooms, blast freezing and thermal storage
  • Food-grade and hygienic services design; material and finish selection
  • Oil-free compressed air generation, drying and distribution
  • Automatic process control, instrumentation and control narrative
  • Electrical distribution, motor control centres and variable speed drives
  • Hazardous area classification and equipment selection where applicable
  • Process ventilation, extraction and pressure regime control
  • Manufacturing equipment installation interfaces and hook-up
  • Commissioning against production rate, not just equipment function

What we watch for

The failures that recur on this building type, and where we look for them.

  • Utility capacity sized for day one rather than the intended production ramp
  • Control narrative written after the panels are built
  • Hygiene or classification requirements discovered during installation
  • No spare capacity or isolation for maintenance without stopping the line

The following describes the standard engineering scope for this sector. The specific scope of any individual commission is set by its brief and contract.

Project location

Tanjung Malim, Perak

Open in Google Maps